Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Pod Point · EV charging site

Pod Point Motorline Gatwick - Hyundai

Fleming Way Crawley, RH10 9JW

Pod Point Motorline Gatwick - Hyundai is an EV charging site in Crawley, West Sussex, run by Pod Point. Both of its sockets are 7 kW Type 2, and the published price is £1.99 per kWh. Amp Map measured 0% uptime here over the last 30 days. 4 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Pod Point Tesco Extra - Crawley (Rapid Charger), 0.7 miles away.

Status

Out of service

Checking status…

VerifiedLive status and details from Pod Point’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 7 kW2 connectors · 199.2p per kWhOut of service
Suzy-Leon0% reliabilityOut of order
Suzy-Leon0% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Pod Point
Opening hours
Not published
Payment
In the Pod Point app
Charger ID
Suzy-Leon
Getting there
For any parking restrictions that may apply, please check relevant signage.

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 27 kW199.2p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£110
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£79
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£102
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£101
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£85
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£81
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£56

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Pod Point Motorline Gatwick - Hyundai?

The listed price is £1.99/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Pod Point Motorline Gatwick - Hyundai?

Up to 7 kW AC via Type 2.

How many charging sockets does Pod Point Motorline Gatwick - Hyundai have?

2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.

How reliable is Pod Point Motorline Gatwick - Hyundai?

Amp Map measured 0% uptime here from recorded live status over the last 30 days.

Who operates Pod Point Motorline Gatwick - Hyundai?

Pod Point Motorline Gatwick - Hyundai is on the Pod Point network.

Where is the nearest charger with 50 kW or more to Pod Point Motorline Gatwick - Hyundai?

Pod Point Tesco Extra - Crawley (Rapid Charger) is 0.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Pod Point Motorline Gatwick - Hyundai?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£110 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Motorline Gatwick - Hyundai?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£79 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pod Point Motorline Gatwick - Hyundai?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£102 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Pod Point · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.