Charge Your Car · EV charging site
West Park Hospital
West Park Hospital, Darlington, DL2 2TS
West Park Hospital is an EV charging site in Darlington, run by Charge Your Car. All 4 of its sockets are 7 kW Type 2, and the price is listed as £1.00/charge admin fee. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Faverdale (Fastned), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public
- Price
- £1.00/charge admin fee(from Open Charge Map, 1 Feb 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at West Park Hospital (Charge Your Car)?
The listed price is £1.00/charge admin fee. Prices can change, so check the price at the charger before you start.
How fast is charging at West Park Hospital (Charge Your Car)?
Up to 7 kW AC via Type 2.
How many charging sockets does West Park Hospital (Charge Your Car) have?
4 charging sockets: 4 × 7 kW Type 2.
Who operates West Park Hospital?
West Park Hospital is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to West Park Hospital (Charge Your Car)?
Faverdale (Fastned) is 0.6 miles away in a straight line, with up to 400 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at West Park Hospital (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at West Park Hospital (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at West Park Hospital (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.