Lidl · EV charging site
Lidl-Faverdale Road
Faverdale Road, Darlington, DL3 0PE
Lidl-Faverdale Road is an EV charging site in Darlington, run by Lidl. Its 2 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Faverdale (Fastned), 110 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Lidl
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.74/kWh; other tariffs available(from Open Charge Map, 19 Nov 2024)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Lidl-Faverdale Road?
The listed price is £0.74/kWh; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Lidl-Faverdale Road?
Up to 50 kW DC via Type 2, CCS, CHAdeMO.
How many charging sockets does Lidl-Faverdale Road have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 50 kW CCS, 1 × 50 kW CHAdeMO.
Who operates Lidl-Faverdale Road?
Lidl-Faverdale Road is on the Lidl network.
Where is the nearest other charger with 50 kW or more to Lidl-Faverdale Road?
Faverdale (Fastned) is 110 yards away in a straight line, with up to 400 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Lidl-Faverdale Road?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lidl-Faverdale Road?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lidl-Faverdale Road?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.