Chargemaster · EV charging site
BG Group
Thames Valley Park, Reading, RG6 1PT
BG Group is an EV charging site in Reading, run by Chargemaster. All 6 of its sockets are 7 kW Type 2, and charging is listed as free. 5 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Sonning Cutting SF Connect (BP Pulse), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargemaster
- Opening hours
- Not published
- Access
- Private · membership required
- Price
- Free(from Open Charge Map, 11 Feb 2016)
- Phone (from Open Charge Map)
- +44 (0)1582 400331
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at BG Group (Chargemaster)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at BG Group (Chargemaster)?
Up to 7 kW AC via Type 2.
How many charging sockets does BG Group (Chargemaster) have?
6 charging sockets: 6 × 7 kW Type 2.
Who operates BG Group?
BG Group is on the Chargemaster network. For site issues, the operator lists +44 (0)1582 400331.
Can anyone charge at BG Group (Chargemaster)?
The operator lists this charger as private - access is restricted.
Where is the nearest charger with 50 kW or more to BG Group (Chargemaster)?
Sonning Cutting SF Connect (BP Pulse) is 0.4 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at BG Group (Chargemaster)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at BG Group (Chargemaster)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at BG Group (Chargemaster)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Microsoft Campus
- Sonning Cutting SF Connect
- Oracle, Building 520
- Oracle, Building 510
- Wheble Dr
- Manchester Road
- Fastest nearby
- Sonning Cutting SF Connect · 150 kW · 0.4 mi