BP Pulse · EV charging site
The Sandringham
The Sandringham, Quaker's Road, Mangotsfield, BS16 6NH
The Sandringham is an EV charging site in Mangotsfield, South Gloucestershire, run by BP Pulse. It has a single socket, with CCS and CHAdeMO at up to 50 kW, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around 5 pm, and Amp Map measured 100% uptime and recorded 41 charging sessions here over the last 30 days. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Willows Downend - Co-op Car Park (POGO), 0.7 miles away.
Status
1 of 1 available
Checking status…
Connectors
CCS or CHAdeMO or Type 2 · 50 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Not published
- Payment
- In the BP Pulse appRFID card
- Charger ID
- 24647
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 50 kW | 89p per kWh |
| CHAdeMO | 50 kW | 89p per kWh |
| Type 2 | 44 kW | 89p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at The Sandringham (BP Pulse)?
The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at The Sandringham (BP Pulse)?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does The Sandringham (BP Pulse) have?
1 charging socket: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 44 kW Type 2. Live per-socket availability is shown on this page.
When is The Sandringham (BP Pulse) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 5 pm and quietest around 7 am. The live status on this page shows what is free before you set off.
How reliable is The Sandringham (BP Pulse)?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 41 observed charging sessions.
Who operates The Sandringham?
The Sandringham is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to The Sandringham (BP Pulse)?
Willows Downend - Co-op Car Park (POGO) is 0.7 miles away in a straight line, with up to 200 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Sandringham (BP Pulse)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Sandringham (BP Pulse)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Sandringham (BP Pulse)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Willows Downend - Co-op Car Park
- Huntsman Taverners Downend, Bristol
- InstaVolt Costa Coffee
- Pod Point Travelodge - Bristol
- MFG Blackhorse
- Car Park
- Cheapest nearby
- Pod Point Travelodge - Bristol · 50.4p per kWh · 7 kW · 0.9 mi
- Fastest nearby
- Willows Downend - Co-op Car Park · 200 kW · 0.7 mi