Chargeplace Scotland · EV charging site
Cambuslang Gate, Cambuslang
Allison Drive, Cambuslang, G72 7EX
Cambuslang Gate, Cambuslang is an EV charging site in Cambuslang, South Lanarkshire, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2, and charging is listed as free. 4 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Shell Recharge EV Aldi - Cambuslang, 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 27 May 2020)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Cambuslang Gate, Cambuslang (Chargeplace Scotland)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Cambuslang Gate, Cambuslang (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does Cambuslang Gate, Cambuslang (Chargeplace Scotland) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Cambuslang Gate, Cambuslang?
Cambuslang Gate, Cambuslang is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Cambuslang Gate, Cambuslang (Chargeplace Scotland)?
Shell Recharge EV Aldi - Cambuslang is 0.5 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Cambuslang Gate, Cambuslang (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Cambuslang Gate, Cambuslang (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Cambuslang Gate, Cambuslang (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Shell Recharge EV Aldi - Cambuslang
- BookSource EV
- BookSource EV
- Gulf Station Cambuslang
- Storage Vault Cambuslang Carpark
- Pod Point Tesco Superstore - Burnside
- Cheapest nearby
- Pod Point Tesco Superstore - Burnside · 44.4p per kWh · 7 kW · 1.3 mi
- Fastest nearby
- Shell Recharge EV Aldi - Cambuslang · 150 kW · 0.5 mi