Scottish Power · EV charging site
Storage Vault Cambuslang Carpark
Storage Vault, Rutherglen, G32 8YL
Storage Vault Cambuslang Carpark is an EV charging site in Rutherglen, South Lanarkshire, run by Scottish Power. Its 3 sockets reach up to 50 kW, with Type 2 and CHAdeMO at the top speed. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Shell Recharge EV Aldi - Cambuslang, 1.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Scottish Power
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Getting there
- Fullerton Road
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Storage Vault Cambuslang Carpark (Scottish Power)?
Up to 50 kW DC via Type 2, CHAdeMO.
How many charging sockets does Storage Vault Cambuslang Carpark (Scottish Power) have?
3 charging sockets: 1 × 50 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2.
Who operates Storage Vault Cambuslang Carpark?
Storage Vault Cambuslang Carpark is on the Scottish Power network.
Where is the nearest other charger with 50 kW or more to Storage Vault Cambuslang Carpark (Scottish Power)?
Shell Recharge EV Aldi - Cambuslang is 1.4 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Storage Vault Cambuslang Carpark (Scottish Power)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Storage Vault Cambuslang Carpark (Scottish Power)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Storage Vault Cambuslang Carpark (Scottish Power)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- BookSource EV
- BookSource EV
- 350 Wellshot Road
- Cambuslang Gate, Cambuslang
- Balbeggie Street, Glasgow
- Pod Point Tesco Extra - Shettleston
- Cheapest nearby
- Pod Point Tesco Extra - Shettleston · 44.4p per kWh · 7 kW · 1.4 mi