Chargeplace Scotland · EV charging site
Coupers Yard Car Park
Shore Street, Brora, KW8 6HH
Coupers Yard Car Park is an EV charging site in Brora, Highland, run by Chargeplace Scotland. Its 3 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Helmsdale, Car Park Dunrobin Street (Chargeplace Scotland), 100 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- https://chargeplacescotland.org/cpmap/chargepoint/1064098/(from Open Charge Map, 3 Apr 2023)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Coupers Yard Car Park (Chargeplace Scotland)?
The listed price is https://chargeplacescotland.org/cpmap/chargepoint/1064098/. Prices can change, so check the price at the charger before you start.
How fast is charging at Coupers Yard Car Park (Chargeplace Scotland)?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Coupers Yard Car Park (Chargeplace Scotland) have?
3 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 43 kW Type 2, 1 × 43 kW Type 2, 2 × 22 kW Type 2.
Who operates Coupers Yard Car Park?
Coupers Yard Car Park is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest other charger with 50 kW or more to Coupers Yard Car Park (Chargeplace Scotland)?
Helmsdale, Car Park Dunrobin Street (Chargeplace Scotland) is 100 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Coupers Yard Car Park (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Coupers Yard Car Park (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Coupers Yard Car Park (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.