Chargeplace Scotland · EV charging site
Helmsdale, Car Park Dunrobin Street
7-9 Dunrobin Street, Brora, KW8 6JA
Helmsdale, Car Park Dunrobin Street is an EV charging site in Brora, Highland, run by Chargeplace Scotland. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Coupers Yard Car Park (Chargeplace Scotland), 100 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Helmsdale, Car Park Dunrobin Street (Chargeplace Scotland)?
Up to 50 kW DC via Type 2, CHAdeMO.
How many charging sockets does Helmsdale, Car Park Dunrobin Street (Chargeplace Scotland) have?
3 charging sockets: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2.
Who operates Helmsdale, Car Park Dunrobin Street?
Helmsdale, Car Park Dunrobin Street is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest other charger with 50 kW or more to Helmsdale, Car Park Dunrobin Street (Chargeplace Scotland)?
Coupers Yard Car Park (Chargeplace Scotland) is 100 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Helmsdale, Car Park Dunrobin Street (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Helmsdale, Car Park Dunrobin Street (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Helmsdale, Car Park Dunrobin Street (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.