Chargeplace Scotland · EV charging site
Edinburgh Marriott Hotel Car Park
111 Glasgow Road, Edinburgh, EH12 8NF
Edinburgh Marriott Hotel Car Park is an EV charging site in Edinburgh, City of Edinburgh, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2. 4 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Edinburgh, Edinburgh Business Park (Source EV), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Edinburgh Marriott Hotel Car Park (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does Edinburgh Marriott Hotel Car Park (Chargeplace Scotland) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Edinburgh Marriott Hotel Car Park?
Edinburgh Marriott Hotel Car Park is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Edinburgh Marriott Hotel Car Park (Chargeplace Scotland)?
Edinburgh, Edinburgh Business Park (Source EV) is 0.5 miles away in a straight line, with up to 160 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Edinburgh Marriott Hotel Car Park (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Edinburgh Marriott Hotel Car Park (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Edinburgh Marriott Hotel Car Park (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Edinburgh Marriott Hotel, Edinburgh
- Edinburgh, Edinburgh Business Park
- Westgate Farm (Edinburgh)
- Pod Point Tesco Extra - Corstorphine
- RBS Headquarters, Edinburgh
- Edinburgh College Sighthill Campus
- Cheapest nearby
- Pod Point Tesco Extra - Corstorphine · 44.4p per kWh · 7 kW · 0.7 mi
- Fastest nearby
- Edinburgh, Edinburgh Business Park · 160 kW · 0.5 mi