Chargeplace Scotland · EV charging site
Glenrothes - Facilities Management
Blackwood Drive, Glenrothes, KY7 6GH
Glenrothes - Facilities Management is an EV charging site in Glenrothes, Fife, run by Chargeplace Scotland. Its 3 sockets reach up to 50 kW, with Type 2 and CHAdeMO at the top speed. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Bankhead Central (Chargeplace Scotland), 150 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Glenrothes - Facilities Management (Chargeplace Scotland)?
Up to 50 kW DC via Type 2, CHAdeMO.
How many charging sockets does Glenrothes - Facilities Management (Chargeplace Scotland) have?
3 charging sockets: 1 × 43 kW Type 2, 1 × 50 kW Type 2, 1 × 50 kW CHAdeMO.
Who operates Glenrothes - Facilities Management?
Glenrothes - Facilities Management is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest other charger with 50 kW or more to Glenrothes - Facilities Management (Chargeplace Scotland)?
Bankhead Central (Chargeplace Scotland) is 150 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Glenrothes - Facilities Management (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Glenrothes - Facilities Management (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Glenrothes - Facilities Management (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Bankhead Central
- Fife College
- Markinch Railway Station Car Park
- Markinch Rail Station
- McDonald's, Queensway Industrial Estate
- Shell Garage
- Fastest nearby
- McDonald's, Queensway Industrial Estate · 120 kW · 1.5 mi