Chargeplace Scotland · EV charging site
Markinch Rail Station
1 Mitchell Terrace, Glenrothes, KY7 6DJ
Markinch Rail Station is an EV charging site in Glenrothes, Fife, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2. 3 other charging sites are listed within a mile, and the nearest site with 50 kW or more is McDonald's, Queensway Industrial Estate (InstaVolt Ltd), 1.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0141 648 0750
- Getting there
- Post owner: Fife Council
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Markinch Rail Station (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does Markinch Rail Station (Chargeplace Scotland) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Markinch Rail Station?
Markinch Rail Station is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Markinch Rail Station (Chargeplace Scotland)?
McDonald's, Queensway Industrial Estate (InstaVolt Ltd) is 1.3 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Markinch Rail Station (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Markinch Rail Station (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Markinch Rail Station (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Markinch Railway Station Car Park
- Balbirnie Park
- Balbirnie House Hotel
- McDonald's, Queensway Industrial Estate
- Bankhead Central
- Glenrothes - Facilities Management
- Fastest nearby
- McDonald's, Queensway Industrial Estate · 120 kW · 1.3 mi