Chargeplace Scotland · EV charging site
Greenfield Football Centre
Duror St, Rutherglen, G32 6TP
Greenfield Football Centre is an EV charging site in Rutherglen, South Lanarkshire, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2. 4 other charging sites are listed within a mile, and the nearest site with 50 kW or more is The Forge Market, Glasgow (Osprey Charging), 1 mile away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Greenfield Football Centre (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does Greenfield Football Centre (Chargeplace Scotland) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Greenfield Football Centre?
Greenfield Football Centre is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Greenfield Football Centre (Chargeplace Scotland)?
The Forge Market, Glasgow (Osprey Charging) is 1 mile away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Greenfield Football Centre (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Greenfield Football Centre (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Greenfield Football Centre (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Tesco Extra - Shettleston
- 350 Wellshot Road
- Balbeggie Street, Glasgow
- The Forge Market, Glasgow
- Wright Business Centre - 0112
- Athlete's Village
- Cheapest nearby
- Pod Point Tesco Extra - Shettleston · 44.4p per kWh · 7 kW · 0.4 mi
- Fastest nearby
- The Forge Market, Glasgow · 300 kW · 1 mi