Chargeplace Scotland · EV charging site
Hannover Street Bus Station
Hannover Street, Fraserburgh, AB43 9HX
Hannover Street Bus Station is an EV charging site in Fraserburgh, Aberdeenshire, run by Chargeplace Scotland. Its 2 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and the price is listed as £0.47/kWh. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Seaforth Car Park (EZO (IE)), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.47/kWh(from Open Charge Map, 31 Oct 2023)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Hannover Street Bus Station (Chargeplace Scotland)?
The listed price is £0.47/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Hannover Street Bus Station (Chargeplace Scotland)?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Hannover Street Bus Station (Chargeplace Scotland) have?
2 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2, 2 × 22 kW Type 2.
Who operates Hannover Street Bus Station?
Hannover Street Bus Station is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest other charger with 50 kW or more to Hannover Street Bus Station (Chargeplace Scotland)?
Seaforth Car Park (EZO (IE)) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Hannover Street Bus Station (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hannover Street Bus Station (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Hannover Street Bus Station (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- Pod Point Tesco Superstore - Fraserburgh · 44.4p per kWh · 7 kW · 1 mi