EZO (IE) · EV charging site
Seaforth Car Park
Seaforth Street, Fraserburgh, AB43 9BD
Seaforth Car Park is an EV charging site in Fraserburgh, Aberdeenshire, run by EZO (IE). Both of its sockets are 50 kW CCS, and charging is listed as free. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Hannover Street Bus Station (Chargeplace Scotland), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- EZO (IE)
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 12 Jun 2026)
- Getting there
- Follow signs for Arts Centre. In the car park of Dalrymple Hall & Art Centre
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Seaforth Car Park (EZO (IE))?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Seaforth Car Park (EZO (IE))?
Up to 50 kW DC via CCS.
How many charging sockets does Seaforth Car Park (EZO (IE)) have?
2 charging sockets: 2 × 50 kW CCS.
Who operates Seaforth Car Park?
Seaforth Car Park is on the EZO (IE) network.
Where is the nearest other charger with 50 kW or more to Seaforth Car Park (EZO (IE))?
Hannover Street Bus Station (Chargeplace Scotland) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Seaforth Car Park (EZO (IE))?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Seaforth Car Park (EZO (IE))?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Seaforth Car Park (EZO (IE))?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- Pod Point Tesco Superstore - Fraserburgh · 44.4p per kWh · 7 kW · 0.8 mi