Chargeplace Scotland · EV charging site
Hermiston Park & Ride
Hermiston Park & Ride, Edinburgh, EH14 5PX
Hermiston Park & Ride is an EV charging site in Edinburgh, City of Edinburgh, run by Chargeplace Scotland. Its 2 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed, and charging is listed as free. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Bankhead Depot, Edinburgh (Chargeplace Scotland), 1 mile away.
Status
Out of service
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 15 Jul 2021)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Hermiston Park & Ride (Chargeplace Scotland)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Hermiston Park & Ride (Chargeplace Scotland)?
Up to 50 kW DC via CHAdeMO, Type 2, CCS.
How many charging sockets does Hermiston Park & Ride (Chargeplace Scotland) have?
2 charging sockets: 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2, 1 × 50 kW CCS.
Who operates Hermiston Park & Ride?
Hermiston Park & Ride is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest other charger with 50 kW or more to Hermiston Park & Ride (Chargeplace Scotland)?
Bankhead Depot, Edinburgh (Chargeplace Scotland) is 1 mile away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Hermiston Park & Ride (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hermiston Park & Ride (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Hermiston Park & Ride (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Heriot-Watt University, Edinburgh Campus (car Park G)
- Bankhead Depot, Edinburgh
- Westside Plaza Shopping Centre - 0240
- MFG Napier Service Station
- Science and Advice for Scottish Agriculture (SASA)
- Edinburgh College Sighthill Campus
- Cheapest nearby
- Westside Plaza Shopping Centre - 0240 · 69p per kWh · 100 kW · 1.1 mi
- Fastest nearby
- MFG Napier Service Station · 150 kW · 1.2 mi