Chargeplace Scotland · EV charging site
Landscapes and Contracts, Hillngton (1)
Carnegie Road, Renfrew, G52 4JZ
Landscapes and Contracts, Hillngton (1) is an EV charging site in Renfrew, Renfrewshire, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2. 9 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Gulf Universe Station (InstaVolt Ltd), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0141 648 0750
- Getting there
- Post owner: Landscapes and Contracts Access: Mon-Fri 9am to 5pm
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Landscapes and Contracts, Hillngton (1) (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does Landscapes and Contracts, Hillngton (1) (Chargeplace Scotland) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Landscapes and Contracts, Hillngton (1)?
Landscapes and Contracts, Hillngton (1) is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Landscapes and Contracts, Hillngton (1) (Chargeplace Scotland)?
Gulf Universe Station (InstaVolt Ltd) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Landscapes and Contracts, Hillngton (1) (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Landscapes and Contracts, Hillngton (1) (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Landscapes and Contracts, Hillngton (1) (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Landscapes & Contracts
- Southside Housing Association
- Clyde Marine Training Seaforth Road
- Clyde Marine Training, Hillington
- Gulf Universe Station
- MRC, Meikelwood Road, Glasgow
- Fastest nearby
- Gulf Universe Station · 50 kW · 0.6 mi