Chargeplace Scotland · EV charging site
Southside Housing Association
Fifty Pitches Rd, Renfrew, G51 4EB
Southside Housing Association is an EV charging site in Renfrew, Renfrewshire, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2. 8 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Gulf Universe Station (InstaVolt Ltd), 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0141 648 0750
- Notes
- Post owner: Southside Housing Association
- Getting there
- Access: 24 hours Follow the car park round the rear of the building and the charg..
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Southside Housing Association (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does Southside Housing Association (Chargeplace Scotland) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Southside Housing Association?
Southside Housing Association is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Southside Housing Association (Chargeplace Scotland)?
Gulf Universe Station (InstaVolt Ltd) is 0.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Southside Housing Association (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Southside Housing Association (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Southside Housing Association (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Landscapes and Contracts, Hillngton (1)
- Landscapes & Contracts
- MRC, Meikelwood Road, Glasgow
- Southern General Hospital Car Park
- Clyde Marine Training Seaforth Road
- Gulf Universe Station
- Fastest nearby
- Gulf Universe Station · 50 kW · 0.7 mi