Chargeplace Scotland · EV charging site
Letherby Drive
Letherby Drive, Rutherglen, G42 9BA
Letherby Drive is an EV charging site in Rutherglen, South Lanarkshire, run by Chargeplace Scotland. Its 2 sockets reach up to 22 kW, with CCS and CHAdeMO at the top speed. 9 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Hampden Park and Ride (Chargeplace Scotland), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Letherby Drive (Chargeplace Scotland)?
Up to 22 kW AC via Type 2, CCS, CHAdeMO.
How many charging sockets does Letherby Drive (Chargeplace Scotland) have?
2 charging sockets: 2 × 7 kW Type 2, 1 × 22 kW CCS, 1 × 22 kW CHAdeMO.
Who operates Letherby Drive?
Letherby Drive is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Letherby Drive (Chargeplace Scotland)?
Hampden Park and Ride (Chargeplace Scotland) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Letherby Drive (Chargeplace Scotland)?
A 10–80% charge takes about 5h 2m on the 22 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Letherby Drive (Chargeplace Scotland)?
A 10–80% charge takes about 3h 38m on the 22 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Letherby Drive (Chargeplace Scotland)?
A 10–80% charge takes about 4h 39m on the 22 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Hampden Park and Ride
- Holyrood Sports Complex
- Holyrood Leisure Centre
- Aikenhead Filling Station
- Allison Street
- Victoria Road, Glasgow
- Fastest nearby
- Hampden Park and Ride · 50 kW · 0.2 mi