InstaVolt Ltd · EV charging site
Aikenhead Filling Station
Aikenhead Road, Rutherglen, G42 0PN
Aikenhead Filling Station is an EV charging site in Rutherglen, South Lanarkshire, run by InstaVolt Ltd. Both of its sockets are 50 kW CHAdeMO and CCS, and the price is listed as £0.75/kWh. 13 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Hampden Park and Ride (Chargeplace Scotland), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- InstaVolt Ltd
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.75/kWh(from Open Charge Map, 3 Mar 2023)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Aikenhead Filling Station (InstaVolt Ltd)?
The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Aikenhead Filling Station (InstaVolt Ltd)?
Up to 50 kW DC via CHAdeMO, CCS.
How many charging sockets does Aikenhead Filling Station (InstaVolt Ltd) have?
2 charging sockets: 2 × 50 kW CHAdeMO, 2 × 50 kW CCS.
Who operates Aikenhead Filling Station?
Aikenhead Filling Station is on the InstaVolt Ltd network.
Where is the nearest other charger with 50 kW or more to Aikenhead Filling Station (InstaVolt Ltd)?
Hampden Park and Ride (Chargeplace Scotland) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Aikenhead Filling Station (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Aikenhead Filling Station (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Aikenhead Filling Station (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Holyrood Sports Complex
- Holyrood Leisure Centre
- Hampden Park and Ride
- IONITY GmbH IONITY Polmadie
- Letherby Drive
- Allison Street
- Cheapest nearby
- IONITY GmbH IONITY Polmadie · 83.3p per kWh · 350 kW · 0.4 mi
- Fastest nearby
- IONITY GmbH IONITY Polmadie · 350 kW · 0.4 mi