Chargeplace Scotland · EV charging site
Mill Brae Car Park, Ayr (1)
3A Holmston Road, Ayr, KA7 3BA
Mill Brae Car Park, Ayr (1) is an EV charging site in Ayr, South Ayrshire, run by Chargeplace Scotland. It has a single 7 kW Type 2 socket. 14 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Burns Statue Square Car Park (Chargeplace Scotland), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0141 648 0750
- Getting there
- Post owner: South Ayrshire
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Mill Brae Car Park, Ayr (1) (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does Mill Brae Car Park, Ayr (1) (Chargeplace Scotland) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates Mill Brae Car Park, Ayr (1)?
Mill Brae Car Park, Ayr (1) is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Mill Brae Car Park, Ayr (1) (Chargeplace Scotland)?
Burns Statue Square Car Park (Chargeplace Scotland) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Mill Brae Car Park, Ayr (1) (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Mill Brae Car Park, Ayr (1) (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Mill Brae Car Park, Ayr (1) (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Millbrae Car Park, Ayr
- Burns Statue Square, Ayr
- Burns Statue Square Car Park
- Castle Hill Car Park, Ayr
- Ayrshire College
- Barns Crescent Car Park, Ayr (1)
- Fastest nearby
- Burns Statue Square Car Park · 50 kW · 0.2 mi