Chargeplace Scotland · EV charging site
Barns Crescent Car Park, Ayr (1)
28 Miller Road, Ayr, KA7 2AY
Barns Crescent Car Park, Ayr (1) is an EV charging site in Ayr, South Ayrshire, run by Chargeplace Scotland. It has a single 7 kW Type 2 socket. 13 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Burns Statue Square Car Park (Chargeplace Scotland), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0141 648 0750
- Getting there
- Post owner: South Ayrshire
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Barns Crescent Car Park, Ayr (1) (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does Barns Crescent Car Park, Ayr (1) (Chargeplace Scotland) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates Barns Crescent Car Park, Ayr (1)?
Barns Crescent Car Park, Ayr (1) is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Barns Crescent Car Park, Ayr (1) (Chargeplace Scotland)?
Burns Statue Square Car Park (Chargeplace Scotland) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Barns Crescent Car Park, Ayr (1) (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Barns Crescent Car Park, Ayr (1) (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Barns Crescent Car Park, Ayr (1) (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Barns Crescent Car Park, Ayr
- Burns Statue Square Car Park
- Sepa Ayr
- Burns Statue Square, Ayr
- Castle Hill Car Park, Ayr
- Mill Brae Car Park, Ayr (1)
- Fastest nearby
- Burns Statue Square Car Park · 50 kW · 0.1 mi