Chargeplace Scotland · EV charging site
Sepa Ayr
31 Miller RD, Ayr, KA7 2AX
Sepa Ayr is an EV charging site in Ayr, South Ayrshire, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2, and charging is listed as free. 13 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Burns Statue Square Car Park (Chargeplace Scotland), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 20 Mar 2020)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Sepa Ayr (Chargeplace Scotland)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Sepa Ayr (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does Sepa Ayr (Chargeplace Scotland) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Sepa Ayr?
Sepa Ayr is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Sepa Ayr (Chargeplace Scotland)?
Burns Statue Square Car Park (Chargeplace Scotland) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Sepa Ayr (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Sepa Ayr (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Sepa Ayr (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Barns Crescent Car Park, Ayr
- Barns Crescent Car Park, Ayr (1)
- Burns Statue Square Car Park
- Burns Statue Square, Ayr
- Castle Hill Car Park, Ayr
- Mill Brae Car Park, Ayr (1)
- Fastest nearby
- Burns Statue Square Car Park · 50 kW · 0.2 mi