Chargeplace Scotland · EV charging site
Park Hotel
Innerleithen Road, Peebles, EH45 8BA
Park Hotel is an EV charging site in Peebles, The Scottish Borders, run by Chargeplace Scotland. Its 2 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Peebles SF Connect (BP Pulse), 70 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.15/kWh; minimum £1.00(from Open Charge Map, 25 May 2022)
- Phone (from Open Charge Map)
- 0141 648 0750
- Getting there
- Car Park of the Park Hotel
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Park Hotel (Chargeplace Scotland)?
The listed price is £0.15/kWh; minimum £1.00. Prices can change, so check the price at the charger before you start.
How fast is charging at Park Hotel (Chargeplace Scotland)?
Up to 50 kW DC via CHAdeMO, CCS, Type 2.
How many charging sockets does Park Hotel (Chargeplace Scotland) have?
2 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 22 kW Type 2.
Who operates Park Hotel?
Park Hotel is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest other charger with 50 kW or more to Park Hotel (Chargeplace Scotland)?
Peebles SF Connect (BP Pulse) is 70 yards away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Park Hotel (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Park Hotel (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Park Hotel (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Peebles SF Connect
- Peebles Hydro, Peebles
- Rosetta Road
- Rosetta Road, Peebles (1)
- Peebles Golf Club
- Pod Point Forestry and Land Scotland - Glentress
- Cheapest nearby
- Pod Point Forestry and Land Scotland - Glentress · 60p per kWh · 7 kW · 1.8 mi
- Fastest nearby
- Peebles SF Connect · 150 kW · 70 yd