Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Pod Point · EV charging site

Pod Point Forestry and Land Scotland - Glentress

Glentress Forest Innerleithen Road, Peebles, EH45 8NB

Pod Point Forestry and Land Scotland - Glentress is an EV charging site in Peebles, The Scottish Borders, run by Pod Point. All 4 of its sockets are 7 kW Type 2, and the published price is £0.60 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 66% uptime and recorded 86 charging sessions here over the last 30 days. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Macdonald Cardrona Hotel (Roam Charging), 0.8 miles away.

Status

Out of service

Checking status…

VerifiedLive status and details from Pod Point’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

Type 2 · 7 kW4 connectors · 60p per kWhOut of service
Jack-Erin69% reliabilityOut of order
Jack-Erin69% reliabilityOut of order
Mack-Phil58% reliabilityOut of order
Mack-Phil58% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Pod Point
Opening hours
Not published
Payment
In the Pod Point app
Charger ID
Jack-Erin
Getting there
AnPR barrier in operation, therefore you will also be charged for parking at Glentress. Parking tariffs displayed on site or visit the Forestry and Land Scotland website for parking charges. https://forestryandland.gov.scot/visit/forest-parks/tweed-valley-forest-park/glentress

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 27 kW60p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£33
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£24
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£31
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£30
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£26
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£24
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£17

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Pod Point Forestry and Land Scotland - Glentress?

The listed price is £0.60/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Pod Point Forestry and Land Scotland - Glentress?

Up to 7 kW AC via Type 2.

How many charging sockets does Pod Point Forestry and Land Scotland - Glentress have?

4 charging sockets: 4 × 7 kW Type 2. Live per-socket availability is shown on this page.

When is Pod Point Forestry and Land Scotland - Glentress busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 6 pm. The live status on this page shows what is free before you set off.

How reliable is Pod Point Forestry and Land Scotland - Glentress?

Amp Map measured 66% uptime here from recorded live status over the last 30 days, across 86 observed charging sessions.

Who operates Pod Point Forestry and Land Scotland - Glentress?

Pod Point Forestry and Land Scotland - Glentress is on the Pod Point network.

Where is the nearest charger with 50 kW or more to Pod Point Forestry and Land Scotland - Glentress?

Macdonald Cardrona Hotel (Roam Charging) is 0.8 miles away in a straight line, with up to 140 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Pod Point Forestry and Land Scotland - Glentress?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Forestry and Land Scotland - Glentress?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£24 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pod Point Forestry and Land Scotland - Glentress?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Pod Point · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.