Chargeplace Scotland · EV charging site
Scotmid co-operative
2 Harvest Drive, Broxburn, EH28 8QJ
Scotmid co-operative is an EV charging site in Broxburn, West Lothian, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2, and charging is listed as free. 5 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Edinburgh, UK - Newbridge (Tesla), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Customers only
- Price
- free(from Open Charge Map, 9 Apr 2018)
- Phone (from Open Charge Map)
- 0141 648 0750
- Notes
- Workplace car park
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Scotmid co-operative (Chargeplace Scotland)?
The listed price is free. Prices can change, so check the price at the charger before you start.
How fast is charging at Scotmid co-operative (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does Scotmid co-operative (Chargeplace Scotland) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Scotmid co-operative?
Scotmid co-operative is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Can anyone charge at Scotmid co-operative (Chargeplace Scotland)?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to Scotmid co-operative (Chargeplace Scotland)?
Edinburgh, UK - Newbridge (Tesla) is 0.5 miles away in a straight line, with up to 250 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Scotmid co-operative (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Scotmid co-operative (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Scotmid co-operative (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Scotmid HQ
- Western Nissan (Newbridge)
- Edinburgh, UK - Newbridge
- Pod Point Western Nissan
- Scottish Midland Co-operative Society Ltd, Newbridge
- Secure Airparks
- Cheapest nearby
- Pod Point Western Nissan · Free · 7 kW · 0.5 mi
- Fastest nearby
- Edinburgh, UK - Newbridge · 250 kW · 0.5 mi