Pod Point · EV charging site
Pod Point Western Nissan
1 Skene Place Newbridge, Broxburn, EH28 8TJ
Pod Point Western Nissan is an EV charging site in Broxburn, West Lothian, run by Pod Point. Both of its sockets are 7 kW Type 2, and charging is listed as free. 4 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Edinburgh, UK - Newbridge (Tesla), 0.5 miles away.
Status
Not reporting
Checking status…
Connectors
Type 2 · 7 kW
Site information
- Operator
- Pod Point
- Opening hours
- Not published
- Charger ID
- Eddy-Judy
- Getting there
- For any parking restrictions that may apply, please check relevant signage.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| Type 2 | 7 kW | Free per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Pod Point Western Nissan?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Pod Point Western Nissan?
Up to 7 kW AC via Type 2.
How many charging sockets does Pod Point Western Nissan have?
2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.
Who operates Pod Point Western Nissan?
Pod Point Western Nissan is on the Pod Point network.
Where is the nearest charger with 50 kW or more to Pod Point Western Nissan?
Edinburgh, UK - Newbridge (Tesla) is 0.5 miles away in a straight line, with up to 250 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Pod Point Western Nissan?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£0.00 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Western Nissan?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£0.00 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pod Point Western Nissan?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£0.00 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Western Nissan (Newbridge)
- Scotmid HQ
- Edinburgh, UK - Newbridge
- Scotmid co-operative
- Kirkliston Library
- Scottish Midland Co-operative Society Ltd, Newbridge
- Fastest nearby
- Edinburgh, UK - Newbridge · 250 kW · 0.5 mi