Chargeplace Scotland · EV charging site
Sheriffhall Park & Ride, Dalkeith
Sheriffhall Park & Ride, Bonnyrigg, EH22 1FF
Sheriffhall Park & Ride, Dalkeith is an EV charging site in Bonnyrigg, Midlothian, run by Chargeplace Scotland. Its 4 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed, and charging is listed as free. 8 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is IONITY GmbH IONITY Edinburgh Shawfair, 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 15 Sept 2020)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Sheriffhall Park & Ride, Dalkeith (Chargeplace Scotland)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Sheriffhall Park & Ride, Dalkeith (Chargeplace Scotland)?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does Sheriffhall Park & Ride, Dalkeith (Chargeplace Scotland) have?
4 charging sockets: 4 × 22 kW Type 2, 2 × 43 kW Type 2, 2 × 50 kW CHAdeMO, 2 × 50 kW CCS.
Who operates Sheriffhall Park & Ride, Dalkeith?
Sheriffhall Park & Ride, Dalkeith is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest other charger with 50 kW or more to Sheriffhall Park & Ride, Dalkeith (Chargeplace Scotland)?
IONITY GmbH IONITY Edinburgh Shawfair is 0.1 miles away in a straight line, with up to 350 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Sheriffhall Park & Ride, Dalkeith (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Sheriffhall Park & Ride, Dalkeith (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Sheriffhall Park & Ride, Dalkeith (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Scottish Qualification Authority
- IONITY GmbH IONITY Edinburgh Shawfair
- Old Colliery, Dalkeith
- Sheriffhall Park and Ride
- Sheriffhall P & R
- Elginhaugh Farm (Midlothian)
- Cheapest nearby
- IONITY GmbH IONITY Edinburgh Shawfair · 83.3p per kWh · 350 kW · 0.1 mi
- Fastest nearby
- IONITY GmbH IONITY Edinburgh Shawfair · 350 kW · 0.1 mi