Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Osprey Charging · EV charging site

Old Colliery, Dalkeith

Danderhall, Bonnyrigg, EH22 1FD

Old Colliery, Dalkeith is an EV charging site in Bonnyrigg, Midlothian, run by Osprey Charging and open 24 hours a day. Its 5 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around 3 pm, and Amp Map measured 99% uptime and recorded 91 charging sessions here over the last 30 days. 8 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is IONITY GmbH IONITY Edinburgh Shawfair, 110 yards away.

Status

4 of 5 available

Checking status…

VerifiedLive status and details from Osprey’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 50 kW2 connectors · 89p per kWh2 free
#1100% reliabilityAvailable
#3100% reliabilityAvailable
CHAdeMO · 50 kW1 connector · 89p per kWhOut of service
#495% reliabilityOut of order
Type 2 · 16 kW2 connectors · 89p per kWh2 free
#2100% reliabilityAvailable
#5100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Opening hours
Open 24 hours
Parking
Car park
Payment
Bank card at the chargerIn the Osprey appRFID card
Getting there
No Parking Restrictions No Height Restriction No Customer Input Required

Facilities

Restaurant

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS50 kW89p per kWh
CHAdeMO50 kW89p per kWh
Type 216 kW89p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£25

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Old Colliery, Dalkeith (Osprey Charging)?

The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Old Colliery, Dalkeith (Osprey Charging)?

Up to 50 kW DC via CCS, CHAdeMO, Type 2.

How many charging sockets does Old Colliery, Dalkeith (Osprey Charging) have?

5 charging sockets: 2 × 50 kW CCS, 1 × 50 kW CHAdeMO, 2 × 16 kW Type 2. Live per-socket availability is shown on this page.

Is Old Colliery, Dalkeith (Osprey Charging) open 24/7?

Yes - Old Colliery, Dalkeith (Osprey Charging) is open 24 hours a day, 7 days a week.

When is Old Colliery, Dalkeith (Osprey Charging) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 3 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Old Colliery, Dalkeith (Osprey Charging)?

Amp Map measured 99% uptime here from recorded live status over the last 30 days, across 91 observed charging sessions.

Who operates Old Colliery, Dalkeith?

Old Colliery, Dalkeith is on the Osprey Charging network.

Where is the nearest other charger with 50 kW or more to Old Colliery, Dalkeith (Osprey Charging)?

IONITY GmbH IONITY Edinburgh Shawfair is 110 yards away in a straight line, with up to 350 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Old Colliery, Dalkeith (Osprey Charging)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Old Colliery, Dalkeith (Osprey Charging)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Old Colliery, Dalkeith (Osprey Charging)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Osprey · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.