ChargePoint · EV charging site
EG Group Chalk Services
EG Rochester Road, Gravesend, DA12 4TH
EG Group Chalk Services is an EV charging site in Gravesend, Kent, run by ChargePoint. Both of its sockets are 350 kW CCS, and the price is listed as £0.65/kWh. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is MFG Esso Clocktower (GeniePoint), 1.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ChargePoint
- Opening hours
- Not published
- Access
- Public
- Price
- £0.65/kWh(from Open Charge Map, 14 Feb 2024)
- Phone (from Open Charge Map)
- 1-408-841-4500
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at EG Group Chalk Services (ChargePoint)?
The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at EG Group Chalk Services (ChargePoint)?
Up to 350 kW DC via CCS.
How many charging sockets does EG Group Chalk Services (ChargePoint) have?
2 charging sockets: 2 × 350 kW CCS.
Who operates EG Group Chalk Services?
EG Group Chalk Services is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.
Where is the nearest other charger with 50 kW or more to EG Group Chalk Services (ChargePoint)?
MFG Esso Clocktower (GeniePoint) is 1.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at EG Group Chalk Services (ChargePoint)?
A typical 10–80% rapid charge takes about 21 min on the 350 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EG Group Chalk Services (ChargePoint)?
A typical 10–80% rapid charge takes about 23 min on the 350 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at EG Group Chalk Services (ChargePoint)?
A typical 10–80% rapid charge takes about 39 min on the 350 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Echo Square Car Park
- MFG Esso Clocktower
- Parrock Street Car Park
- Parrock Street
- George Gravesend A2 Singlewell
- May Avenue 1
- Cheapest nearby
- Parrock Street · 56p per kWh · 50 kW · 1.2 mi