GeniePoint · EV charging site
MFG Esso Clocktower
139 Milton Road, Gravesend, DA12 2RG
MFG Esso Clocktower is an EV charging site in Gravesend, Kent, run by GeniePoint. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and the price is listed as £1.00 + £0.30/kWh. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Parrock Street (POGO), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £1.00 + £0.30/kWh(from Open Charge Map, 20 Dec 2018)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at MFG Esso Clocktower (GeniePoint)?
The listed price is £1.00 + £0.30/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at MFG Esso Clocktower (GeniePoint)?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does MFG Esso Clocktower (GeniePoint) have?
1 charging socket: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates MFG Esso Clocktower?
MFG Esso Clocktower is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to MFG Esso Clocktower (GeniePoint)?
Parrock Street (POGO) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at MFG Esso Clocktower (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at MFG Esso Clocktower (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at MFG Esso Clocktower (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Parrock Street
- Parrock Street Car Park
- Echo Square Car Park
- May Avenue 1
- EG Group Chalk Services
- Berkeley Modular
- Cheapest nearby
- Parrock Street · 56p per kWh · 50 kW · 0.1 mi
- Fastest nearby
- EG Group Chalk Services · 350 kW · 1.1 mi