ChargePoint · EV charging site
EG Group Frontier Park
Frontier Avenue, Blackburn, BB1 3AL
EG Group Frontier Park is an EV charging site in Blackburn, Blackburn with Darwen, run by ChargePoint. Its 8 sockets reach up to 175 kW, with Type 2 at the top speed. 8 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Eurogarages - Frontier Park (GeniePoint), 60 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ChargePoint
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 1-408-841-4500
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at EG Group Frontier Park (ChargePoint)?
Up to 175 kW DC via CHAdeMO, Type 2.
How many charging sockets does EG Group Frontier Park (ChargePoint) have?
8 charging sockets: 1 × 75 kW CHAdeMO, 1 × 175 kW Type 2, 1 × 75 kW CHAdeMO, 1 × 175 kW Type 2, 1 × 75 kW CHAdeMO, 1 × 175 kW Type 2, 1 × 75 kW CHAdeMO, 1 × 175 kW Type 2.
Who operates EG Group Frontier Park?
EG Group Frontier Park is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.
Where is the nearest other charger with 50 kW or more to EG Group Frontier Park (ChargePoint)?
Eurogarages - Frontier Park (GeniePoint) is 60 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at EG Group Frontier Park (ChargePoint)?
A typical 10–80% rapid charge takes about 24 min on the 175 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EG Group Frontier Park (ChargePoint)?
A typical 10–80% rapid charge takes about 23 min on the 175 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at EG Group Frontier Park (ChargePoint)?
A typical 10–80% rapid charge takes about 39 min on the 175 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.