GeniePoint · EV charging site
The Peel Centre
Whitebirk Drive, Blackburn, BB1 3HT
The Peel Centre is an EV charging site in Blackburn, Blackburn with Darwen, run by GeniePoint. All 4 of its sockets are 22 kW Type 2, and the price is listed as 50p Connetion fee then 30p/kWh. 9 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Eurogarages - Frontier Park (GeniePoint), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- 50p Connetion fee then 30p/kWh(from Open Charge Map, 10 Oct 2020)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at The Peel Centre (GeniePoint)?
The listed price is 50p Connetion fee then 30p/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at The Peel Centre (GeniePoint)?
Up to 22 kW AC via Type 2.
How many charging sockets does The Peel Centre (GeniePoint) have?
4 charging sockets: 2 × 22 kW Type 2, 2 × 22 kW Type 2.
Who operates The Peel Centre?
The Peel Centre is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest charger with 50 kW or more to The Peel Centre (GeniePoint)?
Eurogarages - Frontier Park (GeniePoint) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Peel Centre (GeniePoint)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Peel Centre (GeniePoint)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Peel Centre (GeniePoint)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Carpark Fb Blackburn 1
- EG Group My Lahore 2
- Blackburn Technology Management Centre
- EG Group Hilton 3
- Eurogarages - Frontier Park
- EG Group Frontier Park
- Fastest nearby
- EG Group Frontier Park · 175 kW · 0.4 mi