Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

ChargePoint · EV charging site

RAW Charging Yard, The Urban Building

Albert Street, Slough, SL1 1EL

RAW Charging Yard, The Urban Building is an EV charging site in Slough, run by ChargePoint. Its 4 sockets reach up to 350 kW, with CCS at the top speed, and the price is listed as £0.57/kWh. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Pod Point Tesco Extra - Slough, 0.4 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 10 Oct 2022Last verified 10 Oct 2022

Connectors

CCS · 350 kW4 connectors
CCS · 150 kW4 connectors
CHAdeMO · 100 kW2 connectors
Type 2 · 22 kW4 connectors

Site information

Operator
ChargePoint
Opening hours
Not published
Access
Public · membership required · access key required
Price
£0.57/kWh(from Open Charge Map, 10 Oct 2022)
Phone (from Open Charge Map)
1-408-841-4500

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 350 kW CCS~21 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 350 kW CCS~23 min
Audi Q4 e-tron 50 10–80% · 350 kW CCS~39 min
Hyundai IONIQ 5 10–80% · 350 kW CCS~18 min
MG Motor MG4 Trophy 10–80% · 350 kW CCS~30 min
Hyundai Kona Electric Long Range 10–80% · 350 kW CCS~39 min
Nissan LEAF 10–80% · 100 kW CHAdeMO~54 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at RAW Charging Yard, The Urban Building (ChargePoint)?

The listed price is £0.57/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at RAW Charging Yard, The Urban Building (ChargePoint)?

Up to 350 kW DC via Type 2, CCS, CHAdeMO.

How many charging sockets does RAW Charging Yard, The Urban Building (ChargePoint) have?

4 charging sockets: 2 × 22 kW Type 2, 2 × 22 kW Type 2, 2 × 350 kW CCS, 2 × 350 kW CCS, 1 × 100 kW CHAdeMO, 2 × 150 kW CCS, 1 × 100 kW CHAdeMO, 2 × 150 kW CCS.

Who operates RAW Charging Yard, The Urban Building?

RAW Charging Yard, The Urban Building is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.

Where is the nearest other charger with 50 kW or more to RAW Charging Yard, The Urban Building (ChargePoint)?

Pod Point Tesco Extra - Slough is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at RAW Charging Yard, The Urban Building (ChargePoint)?

A typical 10–80% rapid charge takes about 21 min on the 350 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at RAW Charging Yard, The Urban Building (ChargePoint)?

A typical 10–80% rapid charge takes about 23 min on the 350 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at RAW Charging Yard, The Urban Building (ChargePoint)?

A typical 10–80% rapid charge takes about 39 min on the 350 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 10 Oct 2022

Amp Map does not take payment. You pay the operator.