Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

GRIDSERVE · EV charging site

HU - Slough Retail Park

Slough Retail Park, SL1 5AL

HU - Slough Retail Park is an EV charging site in Slough, run by GRIDSERVE and open Mon–Sun 06:00–23:00. Its 8 sockets reach up to 120 kW, with CCS at the top speed, and the published price is £0.85 per kWh. Recorded live status shows it is usually busiest around 2 pm, and Amp Map measured 73% uptime and recorded 1396 charging sessions here over the last 30 days. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Westgate Retail Park, Slough (Osprey Charging), 0.4 miles away.

Status

4 of 8 available

Checking status…

VerifiedLive status and details from GRIDSERVE’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 120 kW6 connectors · 85p per kWh2 free4 in use
#174% reliabilityCharging
#273% reliabilityAvailable
#371% reliabilityCharging
#471% reliabilityCharging
#572% reliabilityCharging
#782% reliabilityAvailable
CHAdeMO · 80 kW2 connectors · 85p per kWh2 free
#673% reliabilityAvailable
#872% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
GRIDSERVE
Opening hours
Mon–Sun 06:00–23:00
Parking
On-street
Payment
Bank card at the chargerIn the GRIDSERVE appRFID card

Facilities

CaféShoppingSupermarketBus stop

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS120 kW85p per kWh
CHAdeMO80 kW85p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 120 kW CCS~31 min · ≈ 55 kWh · ~£47
Tesla Model 3 Rear-Wheel Drive 10–80% · 120 kW CCS~26 min · ≈ 40 kWh · ~£34
Audi Q4 e-tron 50 10–80% · 120 kW CCS~40 min · ≈ 51 kWh · ~£43
Hyundai IONIQ 5 10–80% · 120 kW CCS~27 min · ≈ 51 kWh · ~£43
MG Motor MG4 Trophy 10–80% · 120 kW CCS~32 min · ≈ 43 kWh · ~£36
Hyundai Kona Electric Long Range 10–80% · 120 kW CCS~39 min · ≈ 41 kWh · ~£35
Nissan LEAF 10–80% · 80 kW CHAdeMO~54 min · ≈ 28 kWh · ~£24

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at HU - Slough Retail Park (GRIDSERVE)?

The listed price is £0.85/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at HU - Slough Retail Park (GRIDSERVE)?

Up to 120 kW DC via CCS, CHAdeMO.

How many charging sockets does HU - Slough Retail Park (GRIDSERVE) have?

8 charging sockets: 6 × 120 kW CCS, 2 × 80 kW CHAdeMO. Live per-socket availability is shown on this page.

When is HU - Slough Retail Park (GRIDSERVE) open?

Opening hours: Mon–Sun 06:00–23:00.

When is HU - Slough Retail Park (GRIDSERVE) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is HU - Slough Retail Park (GRIDSERVE)?

Amp Map measured 73% uptime here from recorded live status over the last 30 days, across 1396 observed charging sessions.

Who operates HU - Slough Retail Park?

HU - Slough Retail Park is on the GRIDSERVE network.

Where is the nearest other charger with 50 kW or more to HU - Slough Retail Park (GRIDSERVE)?

Westgate Retail Park, Slough (Osprey Charging) is 0.4 miles away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at HU - Slough Retail Park (GRIDSERVE)?

A typical 10–80% rapid charge takes about 31 min on the 120 kW CCS here, adding roughly 55 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at HU - Slough Retail Park (GRIDSERVE)?

A typical 10–80% rapid charge takes about 26 min on the 120 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at HU - Slough Retail Park (GRIDSERVE)?

A typical 10–80% rapid charge takes about 40 min on the 120 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: GRIDSERVE · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.