Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Osprey Charging · EV charging site

Westgate Retail Park, Slough

Westgate Retail Park, Slough, SL1 5PS

Westgate Retail Park, Slough is an EV charging site in Slough, run by Osprey Charging and open 24 hours a day. Its 4 sockets reach up to 150 kW, with CCS at the top speed, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 100% uptime and recorded 311 charging sessions here over the last 30 days. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is HU - Slough Retail Park (GRIDSERVE), 0.4 miles away.

Status

4 of 4 available

Checking status…

VerifiedLive status and details from Osprey’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 150 kW1 connector · 89p per kWh1 free
#1100% reliabilityAvailable
CHAdeMO · 50 kW1 connector · 89p per kWh1 free
#2100% reliabilityAvailable
Type 2 · 22 kW2 connectors · 89p per kWh2 free
#3100% reliabilityAvailable
#4100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Opening hours
Open 24 hours
Parking
Car park
Payment
Bank card at the chargerIn the Osprey appRFID card
Getting there
3 hours free parking - no return within 1 hour Barrier to site No Height Restriction No Customer Input Required

Facilities

Café

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS150 kW89p per kWh
CHAdeMO50 kW89p per kWh
Type 222 kW89p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£25

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Westgate Retail Park, Slough (Osprey Charging)?

The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Westgate Retail Park, Slough (Osprey Charging)?

Up to 150 kW DC via Type 2, CHAdeMO, CCS.

How many charging sockets does Westgate Retail Park, Slough (Osprey Charging) have?

4 charging sockets: 2 × 22 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 150 kW CCS. Live per-socket availability is shown on this page.

Is Westgate Retail Park, Slough (Osprey Charging) open 24/7?

Yes - Westgate Retail Park, Slough (Osprey Charging) is open 24 hours a day, 7 days a week.

When is Westgate Retail Park, Slough (Osprey Charging) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Westgate Retail Park, Slough (Osprey Charging)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 311 observed charging sessions.

Who operates Westgate Retail Park, Slough?

Westgate Retail Park, Slough is on the Osprey Charging network.

Where is the nearest other charger with 50 kW or more to Westgate Retail Park, Slough (Osprey Charging)?

HU - Slough Retail Park (GRIDSERVE) is 0.4 miles away in a straight line, with up to 120 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Westgate Retail Park, Slough (Osprey Charging)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Westgate Retail Park, Slough (Osprey Charging)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Westgate Retail Park, Slough (Osprey Charging)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Osprey · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.