ChargePoint · EV charging site
RAW Greene King Robin Hood C 1
High Street, Cambridge, CB1 9HY
RAW Greene King Robin Hood C 1 is an EV charging site in Cambridge, Cambridgeshire, run by ChargePoint. It has a single 22 kW Type 2 socket. 4 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Cherry Hinton Leisure Centre (Evolt), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ChargePoint
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 1-408-841-4500
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at RAW Greene King Robin Hood C 1 (ChargePoint)?
Up to 22 kW AC via Type 2.
How many charging sockets does RAW Greene King Robin Hood C 1 (ChargePoint) have?
1 charging socket: 1 × 22 kW Type 2.
Who operates RAW Greene King Robin Hood C 1?
RAW Greene King Robin Hood C 1 is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.
Where is the nearest charger with 50 kW or more to RAW Greene King Robin Hood C 1 (ChargePoint)?
Cherry Hinton Leisure Centre (Evolt) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at RAW Greene King Robin Hood C 1 (ChargePoint)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at RAW Greene King Robin Hood C 1 (ChargePoint)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at RAW Greene King Robin Hood C 1 (ChargePoint)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cherry Hinton Leisure Centre
- Lancaster Toyota Cambridge
- Holiday Inn Express Cambridge
- Wulfstan Way
- Babraham P&R 2
- mer Chargepoint Addenbrookes' Hospital
- Fastest nearby
- Wulfstan Way · 51 kW · 0.9 mi