Evolt · EV charging site
Cherry Hinton Leisure Centre
Colville Road, Cambridge, CB1 9EJ
Cherry Hinton Leisure Centre is an EV charging site in Cambridge, Cambridgeshire, run by Evolt. Its 2 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and the price is listed as 0.25. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Wulfstan Way (Evolt), 1.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Evolt
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- 0.25(from Open Charge Map, 6 Nov 2022)
- Phone (from Open Charge Map)
- +448082813508
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Cherry Hinton Leisure Centre (Evolt)?
The listed price is 0.25. Prices can change, so check the price at the charger before you start.
How fast is charging at Cherry Hinton Leisure Centre (Evolt)?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Cherry Hinton Leisure Centre (Evolt) have?
2 charging sockets: 2 × 50 kW CCS, 2 × 50 kW CHAdeMO, 2 × 22 kW Type 2.
Who operates Cherry Hinton Leisure Centre?
Cherry Hinton Leisure Centre is on the Evolt network. For site issues, the operator lists +448082813508.
Where is the nearest other charger with 50 kW or more to Cherry Hinton Leisure Centre (Evolt)?
Wulfstan Way (Evolt) is 1.1 miles away in a straight line, with up to 51 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Cherry Hinton Leisure Centre (Evolt)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Cherry Hinton Leisure Centre (Evolt)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Cherry Hinton Leisure Centre (Evolt)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- RAW Greene King Robin Hood C 1
- Holiday Inn Express Cambridge
- Lancaster Toyota Cambridge
- Wulfstan Way
- Babraham P&R 2
- mer Chargepoint Addenbrookes' Hospital
- Fastest nearby
- Wulfstan Way · 51 kW · 1.1 mi