ChargePoint · EV charging site
RAW Greene King Tap & Railway 2
197 Station Rd, Ferndown, BH22 0JD
RAW Greene King Tap & Railway 2 is an EV charging site in Ferndown, Dorset, run by ChargePoint. Both of its sockets are 22 kW Type 2. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Park Way Car Park (Be.EV), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ChargePoint
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 1-408-841-4500
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at RAW Greene King Tap & Railway 2 (ChargePoint)?
Up to 22 kW AC via Type 2.
How many charging sockets does RAW Greene King Tap & Railway 2 (ChargePoint) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates RAW Greene King Tap & Railway 2?
RAW Greene King Tap & Railway 2 is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.
Where is the nearest charger with 50 kW or more to RAW Greene King Tap & Railway 2 (ChargePoint)?
Park Way Car Park (Be.EV) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at RAW Greene King Tap & Railway 2 (ChargePoint)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at RAW Greene King Tap & Railway 2 (ChargePoint)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at RAW Greene King Tap & Railway 2 (ChargePoint)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- Park Way Car Park · 59p per kWh · 50 kW · 0.2 mi
- Fastest nearby
- Smart Charge · 150 kW · 1.2 mi