ChargePoint · EV charging site
RAW Greene King Weathervane 1
Weathervane Lysander Rd, Longton, ST3 7WA
RAW Greene King Weathervane 1 is an EV charging site in Longton, Stoke-on-Trent, run by ChargePoint. Both of its sockets are 22 kW Type 2. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Meir Service Station (GeniePoint), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ChargePoint
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 1-408-841-4500
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at RAW Greene King Weathervane 1 (ChargePoint)?
Up to 22 kW AC via Type 2.
How many charging sockets does RAW Greene King Weathervane 1 (ChargePoint) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates RAW Greene King Weathervane 1?
RAW Greene King Weathervane 1 is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.
Where is the nearest charger with 50 kW or more to RAW Greene King Weathervane 1 (ChargePoint)?
Meir Service Station (GeniePoint) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at RAW Greene King Weathervane 1 (ChargePoint)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at RAW Greene King Weathervane 1 (ChargePoint)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at RAW Greene King Weathervane 1 (ChargePoint)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Tesco Superstore - Meir Stoke-on-Trent
- Meir Service Station
- Windmill Stoke-On-Trent
- Commerce Street (Taxi)
- Chancery Lane Surface Car Park
- Baths Road
- Cheapest nearby
- Pod Point Tesco Superstore - Meir Stoke-on-Trent · 44.4p per kWh · 7 kW · 160 yd
- Fastest nearby
- Baths Road · 300 kW · 2.4 mi