GeniePoint · EV charging site
Meir Service Station
1013 Uttoxeter Road, Longton, ST3 6HE
Meir Service Station is an EV charging site in Longton, Stoke-on-Trent, run by GeniePoint. Its 2 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed, and the price is listed as £1.00 + £0.30/kWh. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Windmill Stoke-On-Trent (BP Pulse), 1.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- GeniePoint
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £1.00 + £0.30/kWh(from Open Charge Map, 6 Oct 2020)
- Phone (from Open Charge Map)
- +44 800 999 4240
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Meir Service Station (GeniePoint)?
The listed price is £1.00 + £0.30/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Meir Service Station (GeniePoint)?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does Meir Service Station (GeniePoint) have?
2 charging sockets: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates Meir Service Station?
Meir Service Station is on the GeniePoint network. For site issues, the operator lists +44 800 999 4240.
Where is the nearest other charger with 50 kW or more to Meir Service Station (GeniePoint)?
Windmill Stoke-On-Trent (BP Pulse) is 1.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Meir Service Station (GeniePoint)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Meir Service Station (GeniePoint)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Meir Service Station (GeniePoint)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Tesco Superstore - Meir Stoke-on-Trent
- RAW Greene King Weathervane 1
- Windmill Stoke-On-Trent
- Commerce Street (Taxi)
- Chancery Lane Surface Car Park
- Baths Road
- Cheapest nearby
- Pod Point Tesco Superstore - Meir Stoke-on-Trent · 44.4p per kWh · 7 kW · 0.3 mi
- Fastest nearby
- Baths Road · 300 kW · 2.1 mi