ChargePoint · EV charging site
The Castle Hotel
Westgate, Lincoln, LN1 3AS
The Castle Hotel is an EV charging site in Lincoln, Lincolnshire, run by ChargePoint. It has a single 22 kW Type 2 socket, and the price is listed as £0.76/kWh. 23 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Holiday Inn Lincoln (POGO), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ChargePoint
- Opening hours
- Not published
- Access
- Public
- Price
- £0.76/kWh(from Open Charge Map, 25 Apr 2026)
- Phone (from Open Charge Map)
- 1-408-841-4500
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at The Castle Hotel (ChargePoint)?
The listed price is £0.76/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at The Castle Hotel (ChargePoint)?
Up to 22 kW AC via Type 2.
How many charging sockets does The Castle Hotel (ChargePoint) have?
1 charging socket: 2 × 22 kW Type 2.
Who operates The Castle Hotel?
The Castle Hotel is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.
Where is the nearest charger with 50 kW or more to The Castle Hotel (ChargePoint)?
Holiday Inn Lincoln (POGO) is 0.5 miles away in a straight line, with up to 100 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Castle Hotel (ChargePoint)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Castle Hotel (ChargePoint)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Castle Hotel (ChargePoint)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- The Duke William Hotel
- The Lawns Car Park 1
- The Lawn Car Park the Lawn Union Road
- Pod Point 53-67 Yarborough Road (RMA)
- Motherby Car Park 1
- Langworthgate Car Park
- Cheapest nearby
- Pod Point 53-67 Yarborough Road (RMA) · 45.6p per kWh · 7 kW · 0.3 mi