ChargePoint · EV charging site
Translink
Duncrue St, Belfast, BT3 9AR
Translink is an EV charging site at Duncrue St in Belfast, City of Belfast, run by ChargePoint. All 44 of its sockets are 142 kW CCS. Amp Map lists 1 other charge point named Translink in Belfast. 17 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Grove Wellbeing Centre (EZO (IE)), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ChargePoint
- Opening hours
- Not published
- Access
- Private · membership required
- Phone (from Open Charge Map)
- 1-408-841-4500
- Getting there
- Bus Depot; Bus Only
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Translink (ChargePoint)?
Up to 142 kW DC via CCS.
How many charging sockets does Translink (ChargePoint) have?
44 charging sockets: 44 × 142 kW CCS.
Who operates Translink?
Translink is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.
Can anyone charge at Translink (ChargePoint)?
The operator lists this charger as private - access is restricted.
Where is the nearest other charger with 50 kW or more to Translink (ChargePoint)?
Grove Wellbeing Centre (EZO (IE)) is 0.4 miles away in a straight line, with up to 180 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Translink (ChargePoint)?
A typical 10–80% rapid charge takes about 28 min on the 142 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Translink (ChargePoint)?
A typical 10–80% rapid charge takes about 24 min on the 142 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Translink (ChargePoint)?
A typical 10–80% rapid charge takes about 39 min on the 142 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Jennymount Business Park
- Coastways Storage & Removals
- Grove Wellbeing Centre
- Catalyst (Rear)
- Catalyst (Front)
- Lidl Shore Road
- Fastest nearby
- Grove Wellbeing Centre · 180 kW · 0.4 mi