Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

ChargePoint · EV charging site

Translink

Duncrue St, Belfast, BT3 9AR

Translink is an EV charging site at Duncrue St in Belfast, City of Belfast, run by ChargePoint. All 44 of its sockets are 142 kW CCS. Amp Map lists 1 other charge point named Translink in Belfast. 17 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Grove Wellbeing Centre (EZO (IE)), 0.4 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 25 Oct 2024Last verified 25 Oct 2024

Connectors

CCS · 142 kW44 connectors

Site information

Operator
ChargePoint
Opening hours
Not published
Access
Private · membership required
Phone (from Open Charge Map)
1-408-841-4500
Getting there
Bus Depot; Bus Only

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 142 kW CCS~28 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 142 kW CCS~24 min
Audi Q4 e-tron 50 10–80% · 142 kW CCS~39 min
Hyundai IONIQ 5 10–80% · 142 kW CCS~24 min
MG Motor MG4 Trophy 10–80% · 142 kW CCS~30 min
Hyundai Kona Electric Long Range 10–80% · 142 kW CCS~39 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Translink (ChargePoint)?

Up to 142 kW DC via CCS.

How many charging sockets does Translink (ChargePoint) have?

44 charging sockets: 44 × 142 kW CCS.

Who operates Translink?

Translink is on the ChargePoint network. For site issues, the operator lists 1-408-841-4500.

Can anyone charge at Translink (ChargePoint)?

The operator lists this charger as private - access is restricted.

Where is the nearest other charger with 50 kW or more to Translink (ChargePoint)?

Grove Wellbeing Centre (EZO (IE)) is 0.4 miles away in a straight line, with up to 180 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Translink (ChargePoint)?

A typical 10–80% rapid charge takes about 28 min on the 142 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Translink (ChargePoint)?

A typical 10–80% rapid charge takes about 24 min on the 142 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Translink (ChargePoint)?

A typical 10–80% rapid charge takes about 39 min on the 142 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 25 Oct 2024

Amp Map does not take payment. You pay the operator.