City EV · EV charging site
Main Street, Athelstaneford
Main Street, Musselburgh, EH395BE
Main Street, Athelstaneford is an EV charging site in Musselburgh, East Lothian, run by City EV. It has a single 7 kW Type 2 socket. No other charging site is listed within a mile, and the nearest site with 50 kW or more is John Muir House Rapid Charger (Chargeplace Scotland), 2.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- City EV
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- +44 23 9319 0109
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Main Street, Athelstaneford (City EV)?
Up to 7 kW AC via Type 2.
How many charging sockets does Main Street, Athelstaneford (City EV) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates Main Street, Athelstaneford?
Main Street, Athelstaneford is on the City EV network. For site issues, the operator lists +44 23 9319 0109.
Where is the nearest charger with 50 kW or more to Main Street, Athelstaneford (City EV)?
John Muir House Rapid Charger (Chargeplace Scotland) is 2.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Main Street, Athelstaneford (City EV)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Main Street, Athelstaneford (City EV)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Main Street, Athelstaneford (City EV)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Abbot's View, Haddington
- Drem Railway Station, Drem
- Seggarsdean Court
- Long Stay Car Park Charging Hub
- John Muir House Rapid Charger
- John Muir House (Electric Car Park)
- Fastest nearby
- John Muir House Rapid Charger · 50 kW · 2.5 mi