City EV · EV charging site
The Kings Gap (Opp Green Lodge Hotel)
The Kings Gap (Opp Green Lodge, Moreton, CH47 1HQ
The Kings Gap (Opp Green Lodge Hotel) is an EV charging site in Moreton, Metropolitan Borough of Wirral, run by City EV. It has a single 7 kW Type 2 socket. 9 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Railway (Meols) (evyve), 1.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- City EV
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- +44 23 9319 0109
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at The Kings Gap (Opp Green Lodge Hotel) (City EV)?
Up to 7 kW AC via Type 2.
How many charging sockets does The Kings Gap (Opp Green Lodge Hotel) (City EV) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates The Kings Gap (Opp Green Lodge Hotel)?
The Kings Gap (Opp Green Lodge Hotel) is on the City EV network. For site issues, the operator lists +44 23 9319 0109.
Where is the nearest charger with 50 kW or more to The Kings Gap (Opp Green Lodge Hotel) (City EV)?
Railway (Meols) (evyve) is 1.2 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Kings Gap (Opp Green Lodge Hotel) (City EV)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Kings Gap (Opp Green Lodge Hotel) (City EV)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Kings Gap (Opp Green Lodge Hotel) (City EV)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.