City EV · EV charging site
The Moody Cow
Bargoed Farm, Llwyncelyn, Aberaeron SA46 0HL, Llanarth
The Moody Cow is an EV charging site in Llanarth, County of Ceredigion, run by City EV. Both of its sockets are 7 kW Type 2, and the price is listed as £0.42/kWh. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Car Park off Teras-Yr_Osaf Llanybydder (Evolt), 10.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- City EV
- Opening hours
- Not published
- Access
- Public
- Price
- £0.42/kWh(from Open Charge Map, 10 Jan 2023)
- Phone (from Open Charge Map)
- +44 23 9319 0109
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at The Moody Cow (City EV)?
The listed price is £0.42/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at The Moody Cow (City EV)?
Up to 7 kW AC via Type 2.
How many charging sockets does The Moody Cow (City EV) have?
2 charging sockets: 1 × 7 kW Type 2.
Who operates The Moody Cow?
The Moody Cow is on the City EV network. For site issues, the operator lists +44 23 9319 0109.
Where is the nearest charger with 50 kW or more to The Moody Cow (City EV)?
Car Park off Teras-Yr_Osaf Llanybydder (Evolt) is 10.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Moody Cow (City EV)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Moody Cow (City EV)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Moody Cow (City EV)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Neuadd Cyngor
- Aberaeron Leisure Centre
- National Trust - Llanerchaeron
- Regent Street Car Park, Aberaeron
- Glan Y Mor, Aberaeron
- Rock Street Car Park
- Fastest nearby
- Neuadd Cyngor · 22 kW · 2.4 mi