Silverstone Green Energy · EV charging site
Aberaeron Leisure Centre
South Road, Aberaeron, SA46 0DP
Aberaeron Leisure Centre is an EV charging site in Aberaeron, County of Ceredigion, run by Silverstone Green Energy. Both of its sockets are 22 kW Type 2. 3 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Cwmins Car Park, Lampeter (Silverstone Green Energy), 11.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Silverstone Green Energy
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Aberaeron Leisure Centre (Silverstone Green Energy)?
Up to 22 kW AC via Type 2.
How many charging sockets does Aberaeron Leisure Centre (Silverstone Green Energy) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Aberaeron Leisure Centre?
Aberaeron Leisure Centre is on the Silverstone Green Energy network.
Where is the nearest charger with 50 kW or more to Aberaeron Leisure Centre (Silverstone Green Energy)?
Cwmins Car Park, Lampeter (Silverstone Green Energy) is 11.6 miles away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Aberaeron Leisure Centre (Silverstone Green Energy)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Aberaeron Leisure Centre (Silverstone Green Energy)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Aberaeron Leisure Centre (Silverstone Green Energy)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.