Silverstone Green Energy · EV charging site
Cwmins Car Park, Lampeter
Peterwell Terrace, Lampeter, SA48 7DQ
Cwmins Car Park, Lampeter is an EV charging site in Lampeter, County of Ceredigion, run by Silverstone Green Energy. Its 2 sockets reach up to 60 kW, with Type 2 at the top speed. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Car Park off Teras-Yr_Osaf Llanybydder (Evolt), 4.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Silverstone Green Energy
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Cwmins Car Park, Lampeter (Silverstone Green Energy)?
Up to 60 kW DC via Type 2, CHAdeMO.
How many charging sockets does Cwmins Car Park, Lampeter (Silverstone Green Energy) have?
2 charging sockets: 1 × 60 kW Type 2, 1 × 50 kW CHAdeMO.
Who operates Cwmins Car Park, Lampeter?
Cwmins Car Park, Lampeter is on the Silverstone Green Energy network.
Where is the nearest other charger with 50 kW or more to Cwmins Car Park, Lampeter (Silverstone Green Energy)?
Car Park off Teras-Yr_Osaf Llanybydder (Evolt) is 4.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Cwmins Car Park, Lampeter (Silverstone Green Energy)?
A typical 10–80% rapid charge takes about 58 min on the 60 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Cwmins Car Park, Lampeter (Silverstone Green Energy)?
A typical 10–80% rapid charge takes about 43 min on the 60 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Cwmins Car Park, Lampeter (Silverstone Green Energy)?
A typical 10–80% rapid charge takes about 57 min on the 60 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- Pod Point UWTSD - Lampeter · 34.8p per kWh · 7 kW · 0.3 mi