Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Clenergy · EV charging site

Bridge Street

Bridge Street, Lampeter, SA40 9XX

Bridge Street is an EV charging site in Lampeter, County of Ceredigion, run by Clenergy. Both of its sockets are 22 kW Type 2, and the price is listed as £0.75/kWh. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Car Park off Teras-Yr_Osaf Llanybydder (Evolt), 70 yards away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 10 Jan 2023Last verified 10 Jan 2023

Connectors

Type 2 · 22 kW2 connectors

Site information

Operator
Clenergy
Opening hours
Not published
Access
Public
Price
£0.75/kWh(from Open Charge Map, 10 Jan 2023)

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Bridge Street (Clenergy)?

The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Bridge Street (Clenergy)?

Up to 22 kW AC via Type 2.

How many charging sockets does Bridge Street (Clenergy) have?

2 charging sockets: 2 × 22 kW Type 2.

Who operates Bridge Street?

Bridge Street is on the Clenergy network.

Where is the nearest charger with 50 kW or more to Bridge Street (Clenergy)?

Car Park off Teras-Yr_Osaf Llanybydder (Evolt) is 70 yards away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Bridge Street (Clenergy)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bridge Street (Clenergy)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Bridge Street (Clenergy)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 10 Jan 2023

Amp Map does not take payment. You pay the operator.