Connected Kerb · EV charging site
Chequer Mead Car Park, East Grinstead
Chequer Mead Car Park, East Grinstead, RH19 3LY
Chequer Mead Car Park, East Grinstead is an EV charging site in East Grinstead, West Sussex, run by Connected Kerb. All 6 of its sockets are 7 kW Type 2, and the price is listed as £0.53/kWh. 4 other charging sites are listed within a mile, and the nearest site with 50 kW or more is InstaVolt McDonald's East Grinstead (InstaVolt Ltd), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Connected Kerb
- Opening hours
- Not published
- Access
- Public
- Price
- £0.53/kWh(from Open Charge Map, 22 Feb 2024)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Chequer Mead Car Park, East Grinstead (Connected Kerb)?
The listed price is £0.53/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Chequer Mead Car Park, East Grinstead (Connected Kerb)?
Up to 7 kW AC via Type 2.
How many charging sockets does Chequer Mead Car Park, East Grinstead (Connected Kerb) have?
6 charging sockets: 6 × 7 kW Type 2.
Who operates Chequer Mead Car Park, East Grinstead?
Chequer Mead Car Park, East Grinstead is on the Connected Kerb network.
Where is the nearest charger with 50 kW or more to Chequer Mead Car Park, East Grinstead (Connected Kerb)?
InstaVolt McDonald's East Grinstead (InstaVolt Ltd) is 0.5 miles away in a straight line, with up to 160 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Chequer Mead Car Park, East Grinstead (Connected Kerb)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Chequer Mead Car Park, East Grinstead (Connected Kerb)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Chequer Mead Car Park, East Grinstead (Connected Kerb)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Vicarage Road Car Park 1
- Queensway Car Park 1
- InstaVolt McDonald's East Grinstead
- Norton House Car Park 1
- Forest Garden Shovelstrode
- Crowne Plaza Felbridge
- Cheapest nearby
- Crowne Plaza Felbridge · 89p per kWh · 50 kW · 1.6 mi
- Fastest nearby
- InstaVolt McDonald's East Grinstead · 160 kW · 0.5 mi